Nearly two months to the day, I started what felt like the never ending home improvement project – redoing my half-bath. It all began with a lovely re-grouting experience, and went from there to include painting the walls, installing an new vent fan and a new toilet, a lovely adventure with changing the faucet fixture which resulted in a cracked pipe and about 50 trips to Lowes. This morning I finally put the doors back on the cabinets (having bought the wrong hinges originally, I had to exchange them for one that would actually work!), and it is complete. It looks amazing, and because it’s a half-bath and really too small for me to photograph, you’ll just have to take my word on it.
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| « Nov | ||||||
| 1 | 2 | |||||
| 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| 10 | 11 | 12 | 13 | 14 | 15 | 16 |
| 17 | 18 | 19 | 20 | 21 | 22 | 23 |
| 24 | 25 | 26 | 27 | 28 | 29 | 30 |
| 31 | ||||||