100% Complete

Nearly two months to the day, I started what felt like the never ending home improvement project – redoing my half-bath. It all began with a lovely re-grouting experience, and went from there to include painting the walls, installing an new vent fan and a new toilet, a lovely adventure with changing the faucet fixture which resulted in a cracked pipe and about 50 trips to Lowes. This morning I finally put the doors back on the cabinets (having bought the wrong hinges originally, I had to exchange them for one that would actually work!), and it is complete. It looks amazing, and because it’s a half-bath and really too small for me to photograph, you’ll just have to take my word on it.

1 Comment »

  1. Wendork Said:

    Screw that noise! I’ll be there tomorrow to check it out for myself. I’m bringing Tuna Helper.


{ RSS feed for comments on this post} · { TrackBack URI }

Leave a Comment